print | go back

Ground Plan

For a detailed illustration of our premises, please refer to the following pdf-file.
Ground Plan (.pdf, 1.500 KB)  Ground Plan (.pdf, 1.500 KB)
A: Truck dispatch centre, direct line: 53 82 J: Loading of hot rolled, pickled material (continuous pickling line 2)
B: Steel plant / continuous casting plant K: Main repair shop (SZST)
C: Stock management L: Electrics repair shop
D: Hot strip mill M: Friedrich Hüttenservice GmbH
E: Loading of cold rolled material N: Heavy plates preparation mill
F: Loading of hot dip galvanised and electrogalvanised material O: DEUMU GmbH/Shredder plant
G: Loading of coil coated material P: Slag recycling (Fels GmbH)
H: Loading of hot rolled, pickled material (push-pull pickling line) Q: Oxygen plant Linde AG
I: Loading of hot rolled, pickled material (continuous pickling line 1)  

 

 

© Salzgitter Mannesmann Forschung - Quelle: www.szmf.de - 04.02.2012
http://www.salzgitter-flachstahl.de/en/Kontakt/Werksplan